| This article does not cite any sources. (March 2022) |
Piping Check Passageway B2 is an area of the facility B3 that is featured in Dino Crisis.
Description[]
It is a narrow passage used by the facility personnel for maintenance.
Guide[]
Player can use this passageway to reach the experiment room hall.
Examines[]
| Location | Localization | Original Script |
|---|---|---|
| Air conditioner | An air conditioner for the laboratory area. | 研究エリア内の空調を管理する機械だ |
| Ventilation opening | Will you climb down from the ventilation opening? Yes / No | 通風口から下りますか? Yes / No |
Gallery[]
Bibliography[]
- Hamamura, Kōichi, ed (1999) (in Japanese). DINO CRISIS OFFICIAL GUIDE BOOK. Famitsu. ISBN 9784757205147.







