Dino Crisis Wiki
Advertisement


Power Station Maintenance Memo is a file in Dino Crisis 3.

Location[]

The memo becomes available for download after the player, as Patrick, escapes from Airlock 1.

Transcript[]

Date: September 6, 2248
Radiation emanating from the α System has been causing irregular surges in the ship's energy distribution.

To assess if there's been any serious damage, Engineering will be inspecting the ship's Power Station equipment.


The inspection will require temporary disconnection of the main conduit in the Deck Sector's Power Station.

This procedure is expected to drastically reduce the sector's power supply capacity, affecting the following:


1) Together with the shutdown of local gravity control, the Power Station's conduit control terminal will be rendered inoperable while the Deck Sector is engaged.

2) The formation-change terminal in the Substation/Portside will be inoperable while the conduit is disconnected.


3) During the inspection, access will be restricted at the following points:

- Front Deck/Portside
- Hangar Deck accessway/Portside
- Hazardous Waste Storage/Entrance


Access to these points will require a password
issued at the formation-change terminal in the
Substation area.

The inspection is scheduled for a September 12 completion date.


For further details and dates regarding the Deck Sector disengagement, see MTHR's formation-change registration log.

2248年09月06日現在
α星系からのエネルギー波動が微弱ながら本船のエネルギー制御機器に異常を与備えている事を確認しました。 このためデッキセクター内のパワーステーションで接続されている大型プラグを一時切断し周辺の点検整備を明日から開始します。


整備中は大型プラグ切除のため
デッキセクターのエネルギー効率が
著しくダウンします。
その間は一部の制御機器が
作動しませんのでご注意ください。
詳細については以下の通りです:


① エネルギー効率のダウンにより
デッキセクター一合体時には
パワーステーション内の重力制御と
大型プラグ切替機が操作不能になります。


②大型プラグ切断によりサブステーション・左舷内のフォーメーションチェンジ端末が操作不能になります。

Analysis[]


Gallery[]

Sources[]


Advertisement